next up previous contents
Next: Leakcheck the DU Up: Leak Checking the OVC Previous: Leak Checking   Contents


Disconnecting the Leak Checker

enumerate On the pump cart, close the auxiliary valve.


\begin{shaded}
{\bf Ensure that the auxiliary valve is fully CLOSED
before venting the leak checker.}
\end{shaded}

On the pump cart, open the roughing valve. On the leak checker, press and hold Stop for 3 seconds to vent. Turn off the leak checker. And disconnect the vacuum lines from the pump cart. Let it spin down before moving it.



Jonathan Ouellet 2014-08-26